Santa Monica Community College Liberal Arts South Building

Project Delivery Method: Design-Bid-Build

Contract Value: $13,694,000

Status: Completed

Sustainability: LEED Silver

Project Description: The second wing of this earthquake replacement project totals 25,000 SF, spread out over three floors. The building is consists of concrete decks and structural steel with brick veneer and plaster wall assemblies. The facility features natural ventilation and all exterior walkways and balconies. A dramatic bridge connects the Liberal Arts North Building (also constructed by Pinner). The building makes extensive use of natural lighting with a variety of window types.

Architect: Gensler