project delivery method.
Design-Bid-Build
value.
$10M+
status.
Completed
sustainability.
LEED Silver
project description.
The first wing of this earthquake replacement project totals 23,100 SF, encompassing three levels. The building is constructed of cast-in-place concrete walls and slabs with brick veneer and plaster exterior components. The building features natural ventilation and all exterior walkways and balconies. A dramatic bridge connects both the second and third levels. The building utilizes extensive use of natural lighting with a variety of window types. This project is the colleges first LEED Certified facility.
architect.
Gensler