UC Riverside Batchelor Hall

1. WE O’Neil – $26,123,815.00 – Low Bid Variance
2. 2H Construction – $28,745,5000.00 -$2,621,685.00
3. Skanska USA – $29,230,000.00 – $3,106,185.00
4. Pinner Construction – $30,490,000.00 – $4,366,185.00